Difference between revisions of "Long Andre"

From Fixme.ch
Jump to: navigation, search
(Description)
(Component)
Line 20: Line 20:
  
 
* BOM & list of needed tools are the first things that will be translated
 
* BOM & list of needed tools are the first things that will be translated
 +
* Documentation has almost the status of a component... very soon, access to the Werstatt Lastenrad wiki will be obtained and the key stuff will be translated there (and linked from here presumably). Meanwhile, the first things are being translated here.
  
 
== Schedule ==
 
== Schedule ==

Revision as of 13:44, 22 May 2015

Description

Goal

  • make a 1st working prototype of a Long André
  • organize Long André manufacturing workshops

Obstacles

  • documentation must be translated first (pending)

Component

  • BOM & list of needed tools are the first things that will be translated
  • Documentation has almost the status of a component... very soon, access to the Werstatt Lastenrad wiki will be obtained and the key stuff will be translated there (and linked from here presumably). Meanwhile, the first things are being translated here.

Schedule

  • Opening: May 2015
  • Ending: ?

Participants

  • Léonard (Leader, UCmakerspace guest)
  • Marc Wettstein (UCmakerspace boss)
  • The Werkstatt Lastenrad people in Germany, with whom emails are being exchanged: Christophe Vaillant, André Frieböse, Tom Hansing, Thomas Viebach